New Westminster Rail Bridge
New Westminster Rail Bridge environmental assessment
As part of the harmonized environmental assessment process (EIS) for the proposed Site C Clean Energy Project, TyPlan prepared Section 26 Navigation and Aviation of the EIS. The study was a comprehensive assessment of recreational and aboriginal use on the Peace River as well as a detailed assessment of the proposed effects and mitigation resultant from the construction of a dam on the Peace River. Key report sections included:
- Marine Transit Demand Analysis
- Operational Improvement Assessment